Port Qasim Authority, Bin Qasim, Karachi -75020, Pakistan, Telephone # 92-21-99272111-30 & 92-21-34730101-3, Fax # 92-21-34730108-09, Website: www.pqa.gov.pk Email: [email protected] , NTN-3393123-2
Rear Admiral (R) Syed Hasan Nasir Shah
Container Security Initiative (CSI) designated port.
Ship General Declaration form. ETA to be communicated at least 72, 48 and 24 hours respectively
Day and night access to Port through a 49 km long channel marked by channel buoys up to 13 meter draught vessels.
The Anchorage has good holding ground and vessels with a draft over 13 m can safely anchor 3 miles SW-W of the Fairway Buoy.
Compulsory for vessels calling at the Port. Pilots board and disembark 1.5 nautical miles SW of the Fairway Lt buoy in pos 24" 33.16'N 67" 02.91' E but in SW monsoon the pilots disembark in sheltered area and lead the vessel over the bends to the Fairway.
Port Qasim control on VHF Channel 16. Working on VHF Channel 9 and 10
Visibility is very much reduced during South West monsoon and also during fog or mist at dawn and at dusk in winter.
One covered transit shed of 10,000 sq. m available at berths 2 at Marginal Wharf. Three Term Storage Areas (open) are also available at the Port.
Available at the Port by barge / Tank Lorry.
Cargo handling at the Port is done in private sector. Cargo Handling Companies (CHC’s) at Marginal Wharf are equipped with fork lifters, cranes, hoppers and evacuators for handling general and bulk cargoes.
Available at the Port by request through private party.
Available in private sector
Medical Center with first aid facilities and two well equipped ambulances is available round the clock in port area. Adequate medical and hospitalization facilities are available in the city.
Jinnah International Airport at a distance of 30 km from Port Complex.
14 km railway link to National Railway Network through six railway tracks located immediately behind Marginal Wharf.
PQA has launched multi-faceted strategy i.e. increase port parameters to accommodate larger vessels to benefit from economy of scales, strengthen the port with requisite crafts and build additional berths/terminal for capacity enhancement. Some of the development projects include: Deepening & widening of navigation channel, acquisition of tugs, Establishment of 2nd Container Terminal, Grain & Fertilizer Terminal, LPG Terminal, Coal & Clinker/cement Terminal, World Trade Centre and Development of Waterfronts, etc. To facilitate industrial and commercial establishment at its industrial estate, PQA is also undertaking development of roads, provision of water facilities, sewerage, and stormwater drainage in Eastern Industrial zone at a cost of Rs. 8.8 billion.
Import & Export
Import
Import
Import & Export
Import
Import
Import
Import
Export
Import & Export
Export
Import
Table below shows ship & cargo statistics over last five years
Period | Million Tonnes | No. of Ships |
---|---|---|
2014-15 | 30.1 | 1280 |
2015-16 | 33.32 | 1376 |
2016-17 | 37.4 | 1407 |
2017-18 | 45.6 | 1556 |
2018-19 (Up to April.2019) | 40.6 | 1255 |
Further Changes/details please visit notice to Mariners....
Berths/Terminals | Draught (M) | Beam (M) | LOA (M) |
---|---|---|---|
LCT |
10.00
|
33.00
|
210.00
|
MW Berth No.1 |
10.00 |
33.00 |
225.00 |
MW Berth No.2 |
10.50
|
33.00
|
225.00
|
MW Berth No.3 |
10.00 |
33.00 |
225.00 |
MW Berth No.4 |
10.00
|
33.00
|
225.00
|
QICT-1 |
1(2.00 |
46.50 |
340.00 |
QICT-2 |
13.00 |
46.50 |
340.00 |
FAP G.T. |
13.00 Max. DWT 75000 Tonnes |
43.50 |
250.00 |
EVTL |
11.00 |
40.00 |
225.00 |
IOCB |
12.00 Max. DWT 75000 Tonnes
|
40.00
|
230.00
|
FOTCO |
13.00
|
41.50
|
245.00
|
SSGC / LPG |
10.00 |
33.00 |
163.00 |
There are 9 tugs (Tugs lines) are available at the port
YEAR BUILT 2012
BOLLARD PULL 65
YEAR BUILT 2005
BOLLARD PULL 40
YEAR BUILT 2005
BOLLARD PULL 40
YEAR BUILT 2018
BOLLARD PULL 75
YEAR BUILT 2018
BOLLARD PULL 75
YEAR BUILT 2009
BOLLARD PULL 85
YEAR BUILT 2009
BOLLARD PULL 75
YEAR BUILT 2009
BOLLARD PULL 75
YEAR BUILT 2009
BOLLARD PULL 75